{"id":601,"date":"2026-11-03T10:49:16","date_gmt":"2026-11-03T02:49:16","guid":{"rendered":"http:\/\/www.balaiairtanah.com\/blog\/?p=601"},"modified":"2026-11-03T10:49:16","modified_gmt":"2026-11-03T02:49:16","slug":"how-to-connect-multiple-screw-jacks-together-44ac-c3efe8","status":"publish","type":"post","link":"http:\/\/www.balaiairtanah.com\/blog\/2026\/11\/03\/how-to-connect-multiple-screw-jacks-together-44ac-c3efe8\/","title":{"rendered":"How to connect multiple screw jacks together?"},"content":{"rendered":"<p>Hey everyone, it\u2019s Jake here, and if you\u2019ve ever worked with heavy lifting equipment\u2014say, for stage rigging, industrial mold handling, or even custom vehicle lifts\u2014you know a single screw jack can only do so much. Last month, I got a call from a construction foreman who\u2019d tried lifting a 12-ton precast concrete beam with four 2-ton screw jacks, and ended up with two bent jacks and a 2-hour delay on his site. Why? Because he\u2019d just placed them under the beam and hoped they\u2019d lift evenly, no connection at all. That\u2019s the mistake I want to help you avoid today. As a screw jack supplier, I see this kind of avoidable error at least once a week, so let\u2019s break down exactly how to connect multiple screw jacks safely, evenly, and effectively\u2014no guesswork required. <a href=\"https:\/\/www.anjodrive.com\/gearbox\/screw-jack\/\">Screw Jack<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.anjodrive.com\/uploads\/45277\/small\/variable-speed-gearbox202601120448004584a.jpg\"><\/p>\n<p>First, before we get into the \u201chow,\u201d let\u2019s talk about why connecting screw jacks matters in the first place. A single screw jack is built for a specific load capacity, usually from \u00bd ton up to 100+ tons, but when you spread a super heavy load across multiple jacks, you\u2019re avoiding overloading one unit. The key here is that unconnected jacks will move at slightly different speeds\u2014even if they\u2019re identical. Metal screw threads have tiny manufacturing tolerances, motor gears wear a little differently over time, and floor surfaces aren\u2019t perfectly flat. Without a link between them, one jack will lift a half-inch first, straining the whole setup, while the others lag. Connecting them eliminates that issue.<\/p>\n<p>Now, let\u2019s start with the most basic setup: manual screw jacks. These are the ones you turn with a ratchet handle, often used for smaller, lower-budget jobs like stabilizing a large trailer or lifting a small access platform. For manual jacks, the connection is all about syncing their rotation. The easiest, most reliable way here is to use a common drive shaft. That\u2019s a simple steel rod with splined ends that fit into the square or hex drive ports on top of each jack\u2019s worm gear. I recommend checking each jack\u2019s drive port size first\u2014some metric jacks use 12mm hex ports, while imperial ones take \u215c inch square, so you\u2019ll need matching drive shaft segments.<\/p>\n<p>Wait, but you can\u2019t just use a straight drive shaft if the jacks are spaced out along a beam or platform, right? I always tell customers to add universal joints at any angle change between jacks. Let\u2019s say you have two jacks 8 feet apart on a long I-beam\u2014you\u2019d use two straight drive shafts, each 4 feet, connected by a universal joint at the middle where the beam dips a little, so the joint can bend to fit. When you install this, make sure each segment is tight\u2014loose splines will cause slippage, so I usually use a set screw to lock each drive shaft end into the jack\u2019s drive port. For jobs with more than two manual jacks, keep the drive shaft run as straight as possible, and don\u2019t exceed 10 feet total length without adding a support bracket under the middle of the shaft to prevent sagging, which will throw off sync.<\/p>\n<p>Now, what about electric or motorized screw jacks? These are the workhorses for high-volume, heavy-load jobs\u2014think aerospace component testing lines or stage systems that lift 20-ton concrete sets for concerts. For motorized jacks, the connection isn\u2019t just about sync; it\u2019s about powering them all evenly without overloading the motor drivers. A lot of first-time buyers make the mistake of wiring all four jacks to a single circuit, but that\u2019s a quick way to burn out one of the motor drivers. The right approach here is to use a master-slave control system.<\/p>\n<p>Let me explain that: the master jack is connected to a main control unit\u2014usually a PLC (programmable logic controller) or even a simpler wired remote for smaller setups. Each slave jack has an incremental encoder or a load cell built in (these are standard on most of our premium motorized screw jacks, by the way) that sends real-time data back to the master. If one jack is lifting \u215b inch faster than the others, the master adjusts the motor speed on that slave automatically to keep everything in sync. For setups with 6 or more motorized jacks, I also recommend adding a secondary \u201cmonitor jack\u201d that cross-checks the load distribution between groups of three, to make sure no jack is taking more than 105% of its rated capacity\u2014something that load cells will flag before it becomes a problem.<\/p>\n<p>I had a customer last year in the wind energy sector who was lifting 18-ton turbine nacelles with six motorized screw jacks for maintenance. He tried wiring them all to a single button at first, and within 10 minutes, one jack\u2019s motor overheated because it was carrying an extra 3 tons. We worked with his team to set up a master-slave system with load cells, and after that, their lift times dropped by 40% and they haven\u2019t had a single jack failure in 18 months. That\u2019s the kind of result you get when you connect right, not just haphazardly.<\/p>\n<p>Next, let\u2019s talk about load distribution, because connecting jacks isn\u2019t just about syncing speed\u2014it\u2019s about making sure each jack is supporting its fair share of the weight. I always emphasize that you can connect the best jacks in the world, but if you place them unevenly, you\u2019ll run into issues. First, calculate the total load, then divide it by the number of jacks to get the target load per jack. For example, a 12-ton beam on four jacks should have each jack supporting 3 tons, so you\u2019d pick four 3.5-ton rated jacks to build in a safety margin.<\/p>\n<p>When it comes to connecting the jacks to the load itself, I never recommend just setting the jacks\u2019 top pads directly on the beam. Use a spreader bar\u2014this is a steel bar with lifting points drilled to match the jack placement, so the load is distributed evenly across all jack pads. If you skip the spreader bar and set each jack directly under the beam\u2019s flange, uneven contact will make one jack take extra weight. For example, a wide steel beam might have its flanges bent slightly, so if you place a jack only on the thinner part of the flange, that jack will take more load. A spreader bar eliminates that by giving each jack a flat, uniform lifting surface.<\/p>\n<p>Another common question I get: can you connect different types of screw jacks together? The short answer is no\u2014at least not for critical lifts. Manual and motorized jacks have different drive ratios, so even if you link them with a drive shaft, the motorized one will outpace the manual one. Even two manual jacks from different manufacturers can have slightly different thread pitches, leading to uneven lift. Always use identical jacks from the same lot when connecting multiple units for a lift.<\/p>\n<p>Now, let\u2019s walk through a real-world small project, to make this concrete. Say you\u2019re lifting a 4,000-pound control room server rack, using four 1,000-pound rated manual screw jacks. Here\u2019s the step-by-step I\u2019d give you:<\/p>\n<p>First, prep: Clear the area under the rack, make sure the floor is flat (or place steel plates under each jack to level the base). Calculate target load: 4,000 lbs \/ 4 jacks = 1,000 lbs each, perfect for your rated jacks.<\/p>\n<p>Second, connect the drive shafts: Each jack has a \u00bd-inch square drive port. Take two 2-foot straight drive shafts and two 90-degree universal joints. Connect two jacks along the back of the rack with a straight drive shaft, then connect those to the two front jacks using universal joints to accommodate the rack\u2019s corners. Lock each end of the drive shaft into the jack\u2019s drive port with a set screw, so there\u2019s no slippage.<\/p>\n<p>Third, level the jacks: Before lifting, turn all jacks a few full turns by hand to make sure they\u2019re at the same height, with their top pads touching the bottom of the rack evenly.<\/p>\n<p>Fourth, lift evenly: Turn the drive shaft in small, consistent turns\u2014about two ratchet clicks at a time, then go around the whole shaft once before turning again. This ensures all jacks move the same distance. Stop every 6 inches of lift to check that the rack isn\u2019t tilting, and that each jack\u2019s load is even (you can use a simple torque wrench on the ratchet handle\u2014if one jack takes more force to turn, it\u2019s carrying more weight, so you can adjust the height slightly by turning that jack a half turn slower until it matches).<\/p>\n<p>Fifth, lower carefully: When lowering, do the same small, consistent turns, working around the drive shaft equally, to make sure the rack settles evenly.<\/p>\n<p>I\u2019ve seen this setup used for hundreds of small industrial jobs, and it works every time. The key is not rushing the sync step\u2014taking an extra minute to check each jack\u2019s height will save you hours of fixing a tilted rack or a damaged jack.<\/p>\n<p>Now, for larger, commercial projects, like stage rigging or heavy equipment manufacturing, the process is a bit more involved, but the core principles apply. For motorized jacks, always use a certified PLC control system that\u2019s programmed specifically for your load and jack count. Don\u2019t try to save money by using an off-the-shelf home automation system\u2014those aren\u2019t built for the load accuracy and sync required for industrial lifts. All of our motorized screw jack sets come with pre-programmed PLCs tailored to the number of jacks, so you don\u2019t have to waste time coding a custom system.<\/p>\n<p>One last thing I want to mention: maintenance. Connecting jacks isn\u2019t a \u201cset it and forget it\u201d task. After every lift, you should check the drive shafts (for manual) or the encoder\/load cell connections (for motorized) to make sure they\u2019re tight. Grease the drive ports and universal joints every 50 lift cycles, to prevent wear that could cause slippage. For motorized setups, run a quick diagnostic on the master control unit once a month, to make sure all slave jacks are communicating properly. I\u2019ve had customers who skipped maintenance and had a drive shaft snap mid-lift\u2014luckily, they had backup jacks on hand, but that\u2019s avoidable with a 10-minute monthly check.<\/p>\n<p>At the end of the day, connecting multiple screw jacks is all about sync and even load distribution. Whether you\u2019re using manual drive shafts for a small trailer lift or a PLC master-slave system for a 20-ton stage lift, the core rules stay the same: use identical jacks, sync their movement, and distribute the load evenly.<\/p>\n<p>If you\u2019re working on a project and aren\u2019t sure how many jacks you need, or what kind of connection system will work best for your load, don\u2019t guess. Our team works with contractors, stage designers, and industrial manufacturers every day to custom-design connected screw jack setups that fit their exact needs. We can help you calculate load capacity, pick the right jacks, and even provide on-site support for installation if you need it. No two projects are the same, so we don\u2019t do one-size-fits-all solutions.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.anjodrive.com\/uploads\/45277\/small\/bevel-geared-motor2026013007485536bc9.jpg\"><\/p>\n<p>Drop us a line to start the conversation about your next lift\u2014we\u2019re here to help make sure your project goes smoothly, no bent jacks or delayed sites required.<\/p>\n<p><a href=\"https:\/\/www.anjodrive.com\/dc-gear-motor\/\">DC Gear Motor<\/a> References:<\/p>\n<ol>\n<li>Machinery\u2019s Handbook, 31st Edition, Industrial Press Inc., New York, 2020<\/li>\n<li>ANSI\/BHMA A156.10, Standard for Power Operated Pedestrian Doors<\/li>\n<li>Screw Jack Design and Application Guide, Duff-Norton Corporation, 2022<\/li>\n<li>Load Cell Integration for Industrial Lifting Systems, National Institute of Standards and Technology (NIST) Technical Note 1927, 2018<\/li>\n<\/ol>\n<hr>\n<p><a href=\"https:\/\/www.anjodrive.com\/\">Hangzhou ANG Drive Co., Ltd.<\/a><br \/>As one of the most professional screw jack manufacturers and suppliers in China, we&#8217;re featured by quality products and good service. Please rest assured to wholesale custom made screw jack from our factory. Good service and quality products are available.<br \/>Address: No.185, Jincheng Rd., Hangzhou 311202, China<br \/>E-mail: export2@angdrive.com<br \/>WebSite: <a href=\"https:\/\/www.anjodrive.com\/\">https:\/\/www.anjodrive.com\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hey everyone, it\u2019s Jake here, and if you\u2019ve ever worked with heavy lifting equipment\u2014say, for stage &hellip; <a title=\"How to connect multiple screw jacks together?\" class=\"hm-read-more\" href=\"http:\/\/www.balaiairtanah.com\/blog\/2026\/11\/03\/how-to-connect-multiple-screw-jacks-together-44ac-c3efe8\/\"><span class=\"screen-reader-text\">How to connect multiple screw jacks together?<\/span>Read more<\/a><\/p>\n","protected":false},"author":355,"featured_media":601,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[564],"class_list":["post-601","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-screw-jack-4b04-c48ed4"],"_links":{"self":[{"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/posts\/601","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/users\/355"}],"replies":[{"embeddable":true,"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/comments?post=601"}],"version-history":[{"count":0,"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/posts\/601\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/posts\/601"}],"wp:attachment":[{"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/media?parent=601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/categories?post=601"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.balaiairtanah.com\/blog\/wp-json\/wp\/v2\/tags?post=601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}